Project Details

  • Client NameFincantieri
  • LocationPalermo (Italy)
  • Date2010
  • CategoryNaval

About this project

Construction and assembly of tubes on board of the sixth-generation mobile drilling platform, carried out at Palermo’s canopies.

SCARABEO 8, after its realization, is managed by ENI and is the first oil extraction operation in the Norwegian Barents Sea witch came into operation in 2012. Total length of 119 m Maximum width of 75 m. Gross tonnage is 35.304 tons.